Preparing Your Site for Sod

1. Clear The Site

Clear the site of all building materials (wood, cement, bricks, etc.), as well as any buried stumps, rocks, stones, or other debris larger than 2-3 inches in diameter.

2. Rough Grade The Area

“Rough grade” the area to eliminate any drainage problems. Slope the grade away from building foundations, reduce severe slopes and fill in low-lying areas. Use a tractor-mounted box blade for rough grading large areas. Use hand tools for small areas. Rough grading may uncover more debris to be removed.

3. Till The Soil

Initial tilling to a depth of at least 2 inches should be completed prior to adding any soil amendments. This will control most annual weeds, alleviate subsoil compaction, permit bonding of the topsoil to the subsoil, improve root penetration, air exchange, and water movement. If no new topsoil is going to be added, till to a depth of 4-6 inches.

4. Add Topsoil

Addgood qualitytopsoil to achieve a total depth of 4-6 inches, after firming.To theextent possible, incorporate a nutrient-rich compost/soil blend. (We suggest BigYellowBagBlack Garden Soil – delivery available within zones)

5. Test The Soil pH

Bring a soil sample to your localGarden Centeror county Cooperative Extension office.Turfgrassusually grows best in slightly acid soils (pH of 6.5). Alkaline soils (pH of 7.5 or higher) can be improved by adding sulfur or gypsum. Acidic soils (pH of 6 or lower) can be improved by adding lime.If amendmentsare added, work them into the top 3-4 inchesof the soil.

6. Finish Grade The Site

“Finish grade” the entire site, maintaining the rough grading contours and slopes. The final grade should be approximately ¾” below driveways and sidewalks.

7. Apply Fertilizer

Apply“starter” fertilizer, such as 18-23-12 (N-P-K), at the recommended rate.The middle number, Phosphorus, encourages root growth. Ideally, rake the fertilizer into the top 1-2 inches.

8. Settle The Surface

If your soil is loose and fluffy, you may want to roll the area with a lawn roller to settle the surface. Fill in any low spots. If time permits, allow the area to settle further with rainfall or by applying irrigation.

Your site is now ready to install sod!

How to Prepare Soil for Sod | Site Preparation Tips (2024)

References

Top Articles
Latest Posts
Article information

Author: Manual Maggio

Last Updated:

Views: 6653

Rating: 4.9 / 5 (49 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Manual Maggio

Birthday: 1998-01-20

Address: 359 Kelvin Stream, Lake Eldonview, MT 33517-1242

Phone: +577037762465

Job: Product Hospitality Supervisor

Hobby: Gardening, Web surfing, Video gaming, Amateur radio, Flag Football, Reading, Table tennis

Introduction: My name is Manual Maggio, I am a thankful, tender, adventurous, delightful, fantastic, proud, graceful person who loves writing and wants to share my knowledge and understanding with you.